İş Yerinde
İş Yerinde
Full-Time
Specialist
Engineering
Engineering
486 application
Full-Time
Specialist
486 application
Engineering
LOOKING FOR FULL-TIME ELECTRICAL or ELECTRONICS ENGINEER FOR A BANK HQ BUILDING PROJECT IN ISTANBUL, TURKEY
Position Description:
The Electrical or Electronics Engineer is to be employed by Project Management Company. The project is a high-rise structure; Project Management Company is managing construction and contractors. The Electrical Engineer will be atthe project site; responsible for proper installation of the the ELV systems.
Reports to MEP Manager.
Essential Duties and Responsibilities of this position will be:
Specifically related to the electrical systems:
Acting as liaison with engineers, design consultants, subcontractors, suppliers, inspectors, other job staff and owner’s representatives in resolving issues related to plans and specifications.
Overseeing and making decisions related to contract drawings and subcontracter submittals.
Ensuring that all drawings and specificationsare inline with the budget.
Ensuring strict adherence to safety, ethics and compliance requirements at all times.
Preparing contract and project documents requirements list for all components of the systems. Managing submittals and shop drawings.
Assessing conformance to contract specifications to ensure QA/QC requirements are met. Resolving any conflicts in interpretation.
Managing changes on the work; preparing independent analysis, as required; obtaining and checking estimates for the changes from subcontractors; obtaining approval of the architect and owner; and resolving any conflicts.
Overseeing the project close-out process. Preparing final records for the project such as RFI’s, close-out records, warranties, as-builts, operation and maintenance manuals, attic stock, and spare parts, and evaluating information to ensure compliance with contract documents.
Ensuring that materials and equipment are delivered; installed on time per the project schedule; by utilizing tracking methods.
Scheduling and managing subcontractor trade coordination meetings, and submittal review meetings.
Managing project startup, commissioning, turnover process, punch list, closeout, securing all guarantees, warranties required for acceptance and handover of all the systems.
Understanding Electrical design parameters and systems to evaluate their appropriateness for the project.
Elektrik Mühendisi pozisyonu ile ilgili daha detaylı bilgi almak ya da diğer iş fırsatlarını incelemek için aşağıdaki sayfaları inceleyebilirsiniz.
Elektrik Mühendisi Elektrik Mühendisi Maaşları Elektrik Mühendisi Nasıl Olunur? Elektrik Mühendisi Nedir? Elektrik Mühendisi İş İlanlarıÖzel Sağlık Sigortası.
Elektrik Mühendisi pozisyonu ile ilgili daha detaylı bilgi almak ya da diğer iş fırsatlarını incelemek için aşağıdaki sayfaları inceleyebilirsiniz.
Elektrik Mühendisi Elektrik Mühendisi Maaşları Elektrik Mühendisi Nasıl Olunur? Elektrik Mühendisi Nedir? Elektrik Mühendisi İş İlanları