İş Yerinde
İş Yerinde
Full-Time
Medium Level Manager
Other
Other
389 application
Full-Time
Medium Level Manager
389 application
Other
LOOKING FOR FULL TIME PLANNING CHIEF FOR OUR NEW PROJECT AT ISTANBUL FINANCE CENTER IN ATASEHIR, ISTANBUL
Position Description:
As part of the project management team, must have ability to work independently to maintain and manage multiple schedules for projects with minimal oversight from Management.
Reports to Technical Office (PMCS) Manager
Responsibilities:
Ability to review Extension of Time claims, variation orders, interim progress payments, earned value method analysis, schedule forecasting and provide forensic delay analysis assessments as required.
Assist with other matters such as Contractors pre-qualification of Contractors and Consultants, review of method statements, troubleshooting, etc.
Generate daily, weekly and monthly narrative reports, statistical analysis of baseline schedules, with final submittal to the Client.
Ability to present schedule updates to Client at the project level.
Other reports as required throughout the duration of the project.
Job will be site based for an extended period of time. May require participation in site walks thru active construction works.
Ability to produce the reports using the linear scheduling tools
Requirements:
Candidate must possess at least a bachelor’s degree in a relevant field (construction, engineering, civil, etc.) or higher equivalent.
Minimum 10 year(s) of relevant working experience in schedule/programme management is required for this position.
Required language(s): English
Full-Time position.
Experience in high rise buildings is our preference.
Experience in linear scheduling is our preference.
Experience in the consultant is our preference.
Physical Demands:
The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Performance of the required duties will require physical ability to climb permanent and temporary stairs, passenger use of construction personnel hoists, ability to climb ladders and negotiate work areas under construction. Specific vision abilities required by this job include close vision, peripheral vision, depth perception, and the ability to adjust focus. Performing
this job requires use of hands to finger, handle, or feel objects, tools or controls, sit, talk and hear, stand, climb, balance, stoop, kneel, crouch, or crawl. Employee must occasionally lift and/or move heavy weight.
Work Environment:
The work environment characteristics described here are representative of those an employee encounters while performing the essential functions of the job. Reasonable accommodations may be made to enable individuals with disabilities to perform essential functions. While performing the duties of this job, the employee will work on-site at the construction work site where the employee is exposed to moving mechanical parts; high precarious places; fumes or airborne particles; outside weather conditions and risk of electrical shock. The noise in these work environments is usually moderate to very loud.
Turner is an Equal Opportunity Employer
VEVRAA Federal Contractor
Planlama Şefi pozisyonu ile ilgili daha detaylı bilgi almak ya da diğer iş fırsatlarını incelemek için aşağıdaki sayfaları inceleyebilirsiniz.
Planlama Şefi Planlama Şefi Maaşları Planlama Şefi Nasıl Olunur? Planlama Şefi Nedir? Planlama Şefi İş İlanlarıÖzel Sağlık Sigortası.
Planlama Şefi pozisyonu ile ilgili daha detaylı bilgi almak ya da diğer iş fırsatlarını incelemek için aşağıdaki sayfaları inceleyebilirsiniz.
Planlama Şefi Planlama Şefi Maaşları Planlama Şefi Nasıl Olunur? Planlama Şefi Nedir? Planlama Şefi İş İlanları