warning
İlan yayından kaldırılmıştır

Commissioning Engineer - Control System

General Electric

Ankara

İş Yerinde

İş Yerinde

Job Type

Full-Time

Position Level

Specialist

Department

Application Count

449 application

Job Type

Full-Time

Position Level

Specialist

Application Count

449 application

Department

Kariyer Image

QUALIFICATIONS AND JOB DESCRIPTION

About Us:

GE (NYSE:GE) drives the world forward by tackling its biggest challenges. By combining worldclass engineering with software and analytics, GE helps the world work more efficiently, reliably, and safely. GE people are global, diverse and dedicated, operating with the highest integrity and passion to fulfill GE’s mission and deliver for our customers. www.ge.com.

Role Summary/Purpose:

Mission is to put into service the equipment of control system package under his / her responsibility according to EHS and Quality standard and respecting the given delays.

Essential Responsibilities:

1.Operational

•Prepare the commissioning activities for the concerned product / package: Receive the preparation package including (but not limited to), drawings, Operation and Maintenance Manual, settings notices, Safety notices, commissioning procedures and test reports, field quality working plan, general and specific risk assessment related to the commissioning works, last software version, Site organization chart and communication channel, commissioning schedule,…Set-up the necessary tools including associated calibration certificate

•Execute the commissioning activities of the designated scope of works strictly following the EHS

rules and according to the quality standards: Verify the completion of the erection activities and sign the hand over certificate, define the associated punch list if required. Perform risk assessment and take appropriate control measures before starting any major testing & Commissioning. Issue or take work permit as per site PTW norms for the erection / commissioning activities. Perform the individual tests of the equipment of the designated scope. Perform the functional tests of the equipment of the designated scope. Perform the tests and final adjustments of the equipment during the overall tests. Manage the non-conformity raised during the commissioning activities and report it through the NCM database. Issue weekly report to the Commissioning Manager and the Head of Commissioning department including progress of works and forecast. Manage the subcontractor staff, if any

•Complete the commissioning activities: Issue the final test reports and manage to have it signed by the Client / Engineer. Issue the red-marked drawings. Deliver training to the Client personnel if required. Manage to have a minimalist punch list (issue an internal punch list if necessary). Provide feedback of experience to the Head of commissioning department.

2.Managerial (Budget / Administration / People)

•Achieving all Commissioning milestones within the site schedule •Maintaining customer relationship and a high level of customer satisfaction. Bonus Target Information - IFG GE Renewable Energy. •Representation of GE in front of the customer Engineers. •Maintaining and enhancing the professional image and reputation of GE at all times. Specific Functional/Technical authority (besides DoA): •Is authorized to take urgent or emergency action to remedy sudden problems or discrepancies. Measurement / Key Performance Indicators: •System wise or package wise major milestones achieved on time. •Package wise site Commissioning targets are achieved. •Machines are performing well with desired parameters for concern package. •All the contractual requirements and tests are met for designated package •All the punch points are closed for designated package. •EHS Road Map targets are achieved with zero lost time injuries or fatalities. •Customer satisfaction survey targets are achieved. •All required performance assessments are completed. •All the protocols/ final data/ settings communicated to HO (Commissioning head). •Red marked drawings for designated package are updated and submitted to HO (Commissioning head). •All the feedback are furnished to HO (Commissioning head). Functional/transverse (optional) •Responsible to give/ share feedback of experience to H.O (Head of Commissioning) •Ear mark or convey if any deviation noticed at site equipment/ work as per standards followed.

Qualifications/Requirements:

•University degree (comparable with bachelor / master) or equivalent experience.

•Fluent in English, second language recommended (Chinese, French, German, Hindi, Portuguese,

Spanish, Turkish,…)

•Knowledge of commissioning at least in Control System package.

•3-8 years experience in power plant Commissioning and engineering.

•Extensive knowledge of power plant systems

•Quick and thorough decision making

•Motivating and well-aimed promotion of ideas and concepts

•Delegating, setting priorities and acting directly towards the target, avoid “micro-management”

•Self-motivated and achiever

•Open-minded / flexible for changes and new ideas

Desired Characteristics:

•Trained in Commissioning of control system package and hands on experience of commissioning.

Preferred Candidate

More than 1 years of experience
Bachelor’s(Graduate)
English(Reading : Advanced, Writing : Advanced, Speaking : Advanced)

Devreye Alma Mühendisi pozisyonu ile ilgili daha detaylı bilgi almak ya da diğer iş fırsatlarını incelemek için aşağıdaki sayfaları inceleyebilirsiniz.

Devreye Alma Mühendisi Devreye Alma Mühendisi Maaşları Devreye Alma Mühendisi Nasıl Olunur? Devreye Alma Mühendisi Nedir? Devreye Alma Mühendisi İş İlanları

Devreye Alma Mühendisi pozisyonu ile ilgili daha detaylı bilgi almak ya da diğer iş fırsatlarını incelemek için aşağıdaki sayfaları inceleyebilirsiniz.

Devreye Alma Mühendisi Devreye Alma Mühendisi Maaşları Devreye Alma Mühendisi Nasıl Olunur? Devreye Alma Mühendisi Nedir? Devreye Alma Mühendisi İş İlanları