İş Yerinde
İş Yerinde
Job Type
Full-Time
Position Level
Specialist
Department
Engineering
Engineering
Application Count
597 application
Job Type
Full-Time
Position Level
Specialist
Application Count
597 application
Department
Engineering
QUALIFICATIONS AND JOB DESCRIPTION
LOOKING FOR FULL TIME TECHNICAL OFFICE / REPORTING ENGINEER AT OUR ISTANBUL FINANCE CENTER PROJECT IN ATASEHIR, ISTANBUL
Position Description:
Prepare and maintain project reports and review project baselines, monitor and track progress. Supports project(s) in all other aspects of reporting analysis and special studies. Supports Technical Office activities as related to project.
Essential Duties and Key Responsibilities:
In the areas assigned:
- Report to Technical Office Chief.
- As part of the project management team, must have ability to work independently to maintain and manage multiple schedules for projects with minimal oversight from Management.
- Prepare required presantations and reports with Powerpoint for design and construction monitoring including planned versus actual projection and indicated outcome reports etc.
- Generate daily, weekly and monthly narrative reports, statistical analysis of baseline schedules, with final submittal to the Client.
- Ability to present schedule updates to Client at the project level.
- Provide on-going PCS support for design and construction schedules and cost analysis.
- Oversee tabulation and recording of results of survey, prequalification, proposal submissions, logging and tracking documents, drawing, and technical submittals.
- Ability to review Extension of Time claims, variation orders, interim progress payments, earned value method analysis, schedule forecasting and provide forensic delay analysis assessments as required.
- Review master project scheduling programme, provide regular monitoring and Critical Path analysis.
- Assist with other matters such as Contractors pre-qualification of Contractors and Consultants, review of method statements, troubleshooting, etc.
- Other reports as required throughout the duration of the project.
- Job will be site based for an extended period of time. May require participation in site walks thru active construction works.
- Knowledge of the use of basic safety PPE is a must.
Qualifications:
- Minimum 7 year(s) of relevant working experience in technical office/planning/reporting departmant is required for this position.
- Candidate must possess at least a bachelor’s degree in a relevant field (construction, engineering, civil, etc.) or higher equivalent.
- Good skills in MS Office (word – Excel – Power point) software programs is compulsory. Power BI knowledge is a plus.
- Proficiency in both Primavera P6 Schedule Integration and Microsoft Project software programs is a plus.
- Ability to use Sketch – up / Revit is a plus. Power BI knowledge is a plus.
- Demonstrable background in large high rise / commercial projects is beneficial.
- Must be highly organized, able to prioritize competing demands, detail oriented, maintain accuracy, and self-check work.
- Required language(s): English verbal & written communication skills preferred.
- Must have a good work ethic and integrity, be dependable, adaptable, cooperative, and motivated to take on new responsibilities.
- Able to work with management oversight, and in a team environment.
Physical Demands:
The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Performance of the required duties will require physical ability to climb permanent and temporary stairs, passenger use of construction personnel hoists, ability to climb ladders and negotiate work areas under construction. Specific vision abilities required by this job include close vision, peripheral vision, depth perception, and the ability to adjust focus. Performing
this job requires use of hands to finger, handle, or feel objects, tools or controls, sit, talk and hear, stand, climb, balance, stoop, kneel, crouch, or crawl. Employee must occasionally lift and/or move heavy weight.
Work Environment:
The work environment characteristics described here are representative of those an employee encounters while performing the essential functions of the job. Reasonable accommodations may be made to enable individuals with disabilities to perform essential functions. While performing the duties of this job, the employee will work on-site at the construction work site where the employee is exposed to moving mechanical parts; high precarious places; fumes or airborne particles; outside weather conditions and risk of electrical shock. The noise in these work environments is usually moderate to very loud.
Preferred Candidate
Teknik Ofis Mühendisi pozisyonu ile ilgili daha detaylı bilgi almak ya da diğer iş fırsatlarını incelemek için aşağıdaki sayfaları inceleyebilirsiniz.
Teknik Ofis Mühendisi Teknik Ofis Mühendisi Maaşları Teknik Ofis Mühendisi Nasıl Olunur? Teknik Ofis Mühendisi Nedir? Teknik Ofis Mühendisi İş İlanlarıYan Haklar
Özel Sağlık Sigortası.
Teknik Ofis Mühendisi pozisyonu ile ilgili daha detaylı bilgi almak ya da diğer iş fırsatlarını incelemek için aşağıdaki sayfaları inceleyebilirsiniz.
Teknik Ofis Mühendisi Teknik Ofis Mühendisi Maaşları Teknik Ofis Mühendisi Nasıl Olunur? Teknik Ofis Mühendisi Nedir? Teknik Ofis Mühendisi İş İlanları