Electrical Engineer
About Job

ELECTRICAL ENGINEER
Position Description:
We are seeking an Electrical Engineer experienced in electrical systems design coordination, technical document review, site supervision, quality control, and monitoring testing and commissioning, to provide project management and site supervision services on behalf of the client for our ongoing Data Center project.
The person appointed to this position is expected to monitor, evaluate, and report on behalf of the client whether all electrical works specific to data centers comply with project requirements, technical specifications, quality standards, and the project schedule.
Key Duties & Responsibilities
- Monitor and supervise the design, installation, and commissioning of electrical systems within the data center project from a project management perspective.
- Inspect site installations of Medium Voltage (MV), Low Voltage (LV), UPS, generators, electrical distribution panels, and related critical electrical infrastructure.
- Review and evaluate electrical designs, technical specifications, shop drawings, material approval documents, and contractor technical submittals.
- Ensure technical coordination among design consultants, contractors, subcontractors, and other engineering disciplines.
- Inspect electrical installations for compliance with approved designs, technical specifications, quality standards, and contractual requirements.
- Monitor the integration of monitoring and control systems such as BMS, SCADA, and PMS with the electrical infrastructure and evaluate technical compliance.
- Have actively participated in FAT, SAT, Integrated Systems Testing (IST), Test & Commissioning, and system acceptance processes.
- Identify technical nonconformities and potential project risks relating to electrical systems and follow up on corrective actions.
- Evaluate contractors’ progress on electrical works against the project schedule and report potential delays and risks.
- Check materials and equipment for compliance with approved technical documents and project requirements.
- Track RFIs (Requests for Information), technical document approvals, site inspection reports, and relevant project records.
- Monitor compliance with occupational health and safety and quality assurance/quality control (QA/QC) requirements during site inspections.
- Support technical evaluation and coordination during project completion, testing and commissioning, rectification of outstanding works, and handover to the client.
- Prepare regular reports on progress, quality, technical risks, and site activities related to electrical works.
Qualifications
- Graduate of a university Electrical Engineering or Electrical and Electronics Engineering department,
- Minimum 15 years of experience in electrical systems site installations and project management processes,
- Preferably experienced in Data Center projects or similar critical infrastructure projects,
- Technical knowledge and experience in MV/LV systems, UPS, generators, and electrical distribution systems,
- Knowledge of BMS, SCADA, and PMS systems,
- Ability to evaluate electrical designs, technical specifications, material approvals, and installation documents,
- Knowledge of FAT, SAT, Test & Commissioning, and system acceptance processes,
- Familiarity with IEC, TIA-942, and Uptime Institute standards,
- Proficient in MS Office and AutoCAD, preferably knowledgeable about BIM applications,
- Strong technical coordination, problem-solving, and reporting skills,
- Team-oriented with strong communication skills,
- Good command of English,
- Able to adapt to active site work.
Work Environment:
While performing the duties of this job, the employee regularly works at the construction work site where the employee is exposed to moving mechanical parts; high precarious places; fumes or airborne particles; outside weather conditions, and risk of electrical shock. The noise in these work environments is usually moderate to very loud.
Turner is an Equal Opportunity Employer
Dear Job Applicant,
Your personal data contained in the CVs you have voluntarily submitted in response to this job posting to Turner International Project Management Limited Company (the “Company”), acting as the data controller, is processed by the Company in accordance with the Personal Data Protection Law No. 6698 (“KVKK”) for the purposes of carrying out Employee Candidate / Intern Selection and Placement Processes and Managing Job Application Processes.
We would like to remind you that, should you have any requests regarding your personal data processed as a result of the aforementioned activities, you may exercise your rights granted to data subjects under Article 11 of the KVKK. In this regard, you may contact us through the communication channels provided below.
Yan Haklar
- Hayat Sigortası
- Özel Sağlık Sigortası
Preferred Candidate
Şirket Hakkında
....










